At The Markwell Group we foster a friendly, approachable culture, making us easy to do business with while being responsive to your needs.
Load and crush concrete for the Townsville City Council and produce a product that can be utilised.
Crushed in excess of 250,000 tonne of roadbase, sorted armour rock, screened core rock and laoded and carted to Townsville Port.
Crushing and screening concrete aggregates.
Newcrest Mining Mopu project, crushing engineered fill.
Crushed and delivered in excess of 6,000 tonne of 2.1 and 2.3 roadbase to Pinnacle Views subdivision.
Crushing roadbase for BQC Quarries over the last ten or more years.
Demolished bridge and concrete causeways on the Gregory Development Road. Crushed concrete on site for reuse.
Removal and cartage of 10,000 square meters of concrete hard stand at Ross Island Barracks.
Demolition of 3 storey Sciences building.
Riverway Plaza has been the local shopping district of the Upper Ross community for over 30 years. Markwell was contracted to demolish the existing supermarket & shop fronts, including a small amount of asbestos removal. Testimonial - Nathan Evennett – Director – Phoenix Constructions (QLD) Pty Ltd. “We have been extremely happy with the prompt and professional service we received from Markwell Demolitions on the demolition of the old Rasmussen Riverway shopping centre. A complex demolition job working next to the new active Rasmussen Riverway shopping centre stage making the demolition scope even more difficult. Works were done in a very systematic manner with no incidents or interruption to the new centre and we could not have asked for a better job. Highly recommend Markwell Demolitions.
Demolition at Rockhampton Meatworks
Demolish and cart old Sportpower building in Flinders Street, Townsville City.
Production of engineered fill for tailings dam, 200,000 tonne of blast rock.
Supply plant hire for Pinnacle Views Estate including, excavators, rollers, graders and water carts. These machines utilised trimble to construct the 52 lot subdivision.
In 2010 The Markwell Group constructed Leech Pads, Process Ponds and associated drains for CST Minerals. These dams were constructed using Trimble GPS technology.
The Townsville City Council regularly hire wet and dry hire equipment ranging from graders, skidsteers and trucks.
Provided over 20 machines on wet hire to reclaim the Townsville Port Authority area.
Supply a number of plant including, excavators, articulated dump trucks and crushers and screens.